• The Studio
  • Selected Projects
  • Posts
  • Testimonials
  • Statements
Menu

Law Architects

2 / 45 Watkins St
Fitzroy North
+61 3 9489 9200
Masterplanners - Architects - Project Managers

studio@lawarchitects.com.au

+61 3 9489 9200

Law Architects

  • The Studio
  • Selected Projects
    • Damascus College Stage 7 - Xavier Flood Senior Learning Centre
    • St Kilda Primary School
    • Bayside Community Sports Centre at Sandringham College
    • Monash University Community Family Co-Operative
    • Avila College Ballygriffin Learning Centre
    • St Therese's School Essendon
    • North Eastern Montessori School
    • Mickleham Primary School
    • Avila College Welcome & Administration Building
    • Westgarth Primary School
    • Damascus Events Centre
    • OACC Yirramboi Campus
    • OACC Canowindra Campus
    • Catholic Ladies' College Eltham
    • Greenfield - 6 New Government Schools
    • Woodleigh Homestead 4
    • St Paul's Lutheran Congregation Heritage Church
    • Our Lady of Sion College Performing Arts
    • Santa Maria Year 7 & 8 Village
    • Carlton Learning & Community Hub
    • Our Lady of Good Counsel Deepdene
    • Woodleigh School Senior 'Homesteads' 1,2,3
    • Santa Maria Performing & Creative Arts Complex
    • Tarneit Rise Primary School
    • Viewbank College Performing Arts and Tech Centre
    • Damascus College Stage 1
    • Northcote Childcare OAC
    • Holy Trinity CPS Sunbury
    • Pembroke Primary School New Learning Areas and Sanctuary
    • St Benedict's Church
    • Mannix College Redevelopment Work In Progress
    • Drouin Secondary College
    • Brighton East Childcare OAC
    • Hawthorn Childcare OAC
    • Our Lady of Sion College Notre Dame Centre
    • Camberwell Childcare OAC
    • Melbourne Central OAC Childcare
    • St Macartans Primary School
  • Posts
  • Testimonials
  • Statements

North Eastern Montessori School

Harmony Hall is a new multipurpose facility at NE Montessori School, St Helena in Melbourne.

This compact, 400 sqm building was designed to fulfil the many and varied needs of the school in terms of:

- offering hospitality and welcoming the wider community,

- a gathering space for assemblies, concerts and presentations, and

- a learning space for performing arts and indoor physical education.

The new building is nestled into a tight site amongst established trees near the campus entry along Aqueduct Road, on a sloping site between the existing car park and concrete sports court. It has been able to:

- Create a greater sense of address and street presence for the school along Aqueduct Road.

- Achieve value-for-money outcomes in a flexible space for gatherings, performance, and learning.

- Accommodate more than 220 people in gatherings (with 120 seated in a retractable seating system, space for 100 loose chairs, and more students seated on the floor).

- Provide catered functions through a small commercial kitchen with serveries directly into the hall and externally out to a covered northern patio.

- Accommodate performing arts and physical education specialist learning spaces, along with their associated teacher workspace and storage room.

- Provide much needed student and staff amenities at this front end of the campus.

Instrumental music rooms were originally integral to the facility but with increased construction costs post-COVID, these needed to be excised from the scope. With subsequent additional project funding secured, this allowed for three separate pods, designed for small-group and individual instrumental music learning, to be placed next to Harmony Hall and the sports court.

North Eastern Montessori School

Harmony Hall is a new multipurpose facility at NE Montessori School, St Helena in Melbourne.

This compact, 400 sqm building was designed to fulfil the many and varied needs of the school in terms of:

- offering hospitality and welcoming the wider community,

- a gathering space for assemblies, concerts and presentations, and

- a learning space for performing arts and indoor physical education.

The new building is nestled into a tight site amongst established trees near the campus entry along Aqueduct Road, on a sloping site between the existing car park and concrete sports court. It has been able to:

- Create a greater sense of address and street presence for the school along Aqueduct Road.

- Achieve value-for-money outcomes in a flexible space for gatherings, performance, and learning.

- Accommodate more than 220 people in gatherings (with 120 seated in a retractable seating system, space for 100 loose chairs, and more students seated on the floor).

- Provide catered functions through a small commercial kitchen with serveries directly into the hall and externally out to a covered northern patio.

- Accommodate performing arts and physical education specialist learning spaces, along with their associated teacher workspace and storage room.

- Provide much needed student and staff amenities at this front end of the campus.

Instrumental music rooms were originally integral to the facility but with increased construction costs post-COVID, these needed to be excised from the scope. With subsequent additional project funding secured, this allowed for three separate pods, designed for small-group and individual instrumental music learning, to be placed next to Harmony Hall and the sports court.

1876_NEMontessori_1WEB.jpg
1876_NEMontessori_2WEB.jpg
1876_NEMontessori_3WEB.jpg
1876_NEMontessori_4WEB.jpg
1876_NEMontessori_5WEB.jpg